🎮 Plug into perfection — your 10M ticket to flawless HD entertainment!
This 10-meter high-speed HDMI cable, designed in the UK, features 24K gold-plated connectors and double shielding for interference-free Full HD 1080p transmission. Compatible with a wide range of devices including PS4, Xbox One, Sky HD TV, and PCs, it supports Ethernet, ARC, 3D, and immersive surround sound formats. Built with durable materials and backed by a 3-year warranty, it ensures reliable, long-distance connectivity for home or office setups.
J**W
Does the job
Was a bit worried about getting a long cable as might lose quality or lag, but really good and works well
D**F
Good quality, great length. Like me
Can't fault this for the money. Needed a long length to run a projector to a laptop and this fitted the bill. One thing to note and this is nothing to do with the product, if you're using an adapter as I was with a Surface (mini DP to HDMI) it doesn't work. It's fine for a monitor up to about a metre away but at this length the signal needs power. Once I'd sorted that conundrum out and swapped to a laptop with a dedicated HDMI port all was good. Recommended.
Y**A
Good but heavy
I carry HDMI cables around with me as I travel to delivering training courses from my laptop. It's sensible to have a lengthy cable like this one but I wish it wasn't so thick and heavy. In other circumstances that wouldn't be a problem and might indicate quality. Good value.
J**N
No latency at all
This 10 metre HDMI cable works perfectly. The picture and sound quality are crystal clear even over the long distance. No lag or signal loss. Great choice if you need a longer cable that still performs well!
R**J
LEAD
JUST THE JOB
P**N
Didn't work with PS5
This didn't work with my ps5. The picture kept going off. Not fit for purpose.
A**Y
Excellent
Works like a charm no complaints from me
K**F
Nice long
Good quality
Trustpilot
2 weeks ago
1 week ago